{
  "generated_at": "2026-10-19T20:14:37.487381+00:00",
  "source_url": "https://www.epwater.org/about-us/public-service-board/psb-agendas-minutes",
  "methodology": "Page-local numbered decision excerpts from minutes linked on September and October 2026 PSB meeting pages. Evidence is preserved verbatim for review. This is a scoped decision feed, not a complete award or payment ledger; no monetary totals are inferred.",
  "documents": [
    {
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "checked_at": "2026-10-19T20:14:36.069359+00:00",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "status": "parsed",
      "records": 25
    },
    {
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "checked_at": "2026-10-19T20:14:36.396100+00:00",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "status": "parsed",
      "records": 25
    },
    {
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "checked_at": "2026-10-19T20:14:36.733851+00:00",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "status": "parsed",
      "records": 16
    },
    {
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "checked_at": "2026-10-19T20:14:37.114962+00:00",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "status": "parsed",
      "records": 16
    }
  ],
  "records": [
    {
      "source_page": 2,
      "item_number": "1",
      "evidence": "APPROVED THE MINUTES OF THE REGULARLY SCHEDULED MEETING HELD ON JULY 8,",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "a9e0f3c72bfe7e08354bb5b9"
    },
    {
      "source_page": 2,
      "item_number": "2",
      "evidence": "ADOPTED A RESOLUTION AUTHORIZING THE PRESIDENT/CEO OR DESIGNEE TO \nSUBMIT A GRANT APPLICATION TO THE U.S. BUREAU OF RECLAMATION UNDER THE \nTITLE XVI WATER RECLAMATION AND REUSE PROJECTS GRANT OPPORTUNITY IN THE \nAMOUNT OF $6,000,000 FOR THE PURE WATER CENTER PROJECT, FORMERLY ADVANCED \nWATER PURIFICATION FACILITY; AUTHORIZED EPWATER'S FUNDING COMMITMENT OF \nUP TO $18,000,000 NON-FEDERAL MATCH IF GRANT FUNDS ARE AWARDED; AND FURTHER \nAUTHORIZE THE PRESIDENT/CEO OR DESIGNEE TO PROVIDE AND SIGN ANY \nDOCUMENTS IN CONNECTION WITH THE GRANT APPLICATION, GRANT AGREEMENT, \nAND ACCEPTANCE OF FUNDS FOR THIS PROJECT.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "84fc420999ba087442b73032"
    },
    {
      "source_page": 2,
      "item_number": "3",
      "evidence": "APPROVED A SOLE SOURCE AGREEMENT WITH BADGERMETER, INC. PURSUANT TO \nSECTION 252.022(A)(7)(A) AND (D) OF THE TEXAS LOCAL GOVERNMENT CODE FOR THE \nADVANCED MONITORING OF THE WASTEWATER COLLECTION SYSTEM, FOR AN \nESTIMATED ANNUAL AMOUNT OF $1,000,000 FOR A TERM OF ONE YEAR WITH FOUR ONE-\nYEAR OPTIONS TO EXTEND CONTINGENT UPON THE VENDOR PROVIDING YEARLY \nDOCUMENTATION ATTESTING TO THEIR SOLE SOURCE STATUS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "283827e428bd8d996650ab8e"
    },
    {
      "source_page": 2,
      "item_number": "4",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT \nISSUED TO MSC INDUSTRIAL DIRECT CO., INC., THROUGH THE PURCHASING \nCOOPERATIVE GSA CONTRACT NO. 47QSHA18D002C FOR MAINTENANCE, REPAIR, AND \nOPERATIONS (MRO) SUPPLIES AND SERVICES, BY AN ADDITIONAL $500,000 FOR A \nCUMULATIVE CONTRACT AMOUNT OF $1,000,000 AND AUTHO RIZED THE ISSUANCE OF",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "6c29c213a810eaab6e89fa1a"
    },
    {
      "source_page": 3,
      "item_number": "5",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT \nISSUED TO HACH COMPANY THROUGH THE GSA PURCHASING COOPERATIVE CONTRACT \nNO. 47QSMS26D0027, BY AN ADDITIONAL $1,000,000 FOR A CUMULATIVE CONTRACT \nAMOUNT OF $1,500,000 AND AUTHORIZED THE ISSUANCE OF FUTURE ANNUAL MASTER \nCONTRACTS IN THE ESTIMATED AMOUNT OF $1,500,000 FOR AS LONG AS THE  TERM OF \nTHE COOPERATIVE CONTRACT REMAINS IN PLACE.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "96a5f45951bbb75e4d2de402"
    },
    {
      "source_page": 3,
      "item_number": "6",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT \nISSUED TO EL PASO PHOENIX PUMPS, INC. THROUGH THE PURCHASING COOPERATIVE \nESC REGION 19 CONTRACT NO. 26-7551, BY AN ADDITIONAL $1,500,000 FOR A CUMULATIVE \nCONTRACT AMOUNT TO $2,000,000 AND AUTHORIZED THE ISSUANCE OF FUTURE \nANNUAL MASTER CONTRACTS IN THE ESTIMATED AMOUNT OF $2,000,000 FOR AS LONG \nAS THE TERM OF THE COOPERATIVE CONTRACT REMAINS IN PLACE.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "62328bad13d8327e28d3157b"
    },
    {
      "source_page": 3,
      "item_number": "7",
      "evidence": "AWARDED PROFESSIONAL ENGINEER ING SERVICES CONTRACTS FOR ON -CALL \nCONSTRUCTION MANAGEMENT SERVICES FOR VARIOUS WATER, WASTEWATER, \nRECLAIMED WATER, AND STORMWATER CONSTRUCTION PROJECTS – RFQ 19 -26 TO \nARCADIS U.S., INC., BROWN AND CALDWELL, CEA ENGINEERING GROUP, INC., CDM \nSMITH INC., CONSOR NORTH AMERICA, INC, FREESE AND NICHOLS, INC., GARVER, LLC, \nH2O TERRA, LLC, HUITT -ZOLLARS, INC., JACOBS ENGINEERING GROUP INC., JOHNSON, \nMIRMIRAN & THOMPSON, INC., AND MORENO CARDENAS, INC. FOR AN AMOUNT NOT TO \nEXCEED $1,500,000 FOR EACH FIRM FOR A TERM OF THREE YEARS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "d55564a5a86ed6610c096fe7"
    },
    {
      "source_page": 3,
      "item_number": "8",
      "evidence": "AWARDED A PROFESSIONAL ENGINEERING SERVICES CONTRACT TO CONSOR NORTH \nAMERICA INC., FOR THE WATER DISTRIBUTION ASSESSMENT - RFS 02-26 IN THE AMOUNT \nOF $522,294.24 AND AUTHORIZED FUTURE TASK ORDERS OR AMENDMENTS TO BE ISSUED \nUNDER THIS CONTRACT FOR ADDITIONAL ENGINEERING SERVICES IN THE ESTIMATED \nAMOUNT OF $500,000.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "62953190983dc87d11e1a00b"
    },
    {
      "source_page": 3,
      "item_number": "9",
      "evidence": "AWARDED A PROFESSIONAL ENGINEERING SERVICES CONTRACT TO BATH GROUP, LLC \nFOR THE JOE CARO PUMP STATION REPLACEMENT - PART 2 PROJECT IN THE AMOUNT \nOF $434,490 AND AUTHORIZE D FUTURE TASK ORDERS OR AMENDMENTS TO BE ISSUED \nUNDER THIS CONTRACT FOR ADDITIONAL CONSTRUCTION PHASE SERVICES IN AN \nESTIMATED AMOUNT OF $500,000.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "698ca3d92e81693f47a561d0"
    },
    {
      "source_page": 3,
      "item_number": "10",
      "evidence": "APPROVED CHANGE ORDER NUMBER 2 FOR CSP 08 -24 HEATH DE LEON PUMP WITH \nSMITHCO CONSTRUCTION INC., IN THE A MOUNT OF $2,194,212.11 AND INCREASING THE \nCONTRACT TIME BY 240 CALENDAR DAYS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "180e49c35416ad62f794d20e"
    },
    {
      "source_page": 3,
      "item_number": "11",
      "evidence": "APPROVED CHANGE ORDER NUMBER 4 FOR BID NO. 35-22, CROWN POINT II AND NEVINS \nPACKED TOWER AIR STRIPPERS WITH MORROW ENTERPRISES INC, IN THE AMOUNT OF \n$154,820.98 AND INCREASING THE CONTRACT TIME BY 480 CALENDAR DAYS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "e9c11e15129ef5863755befe"
    },
    {
      "source_page": 3,
      "item_number": "12",
      "evidence": "AUTHORIZED THE PRESIDENT/CEO OR DESIGNEE TO SIGN A STANDARD UTILITY \nAGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION FOR THE \nRELOCATION OF WASTEWATER AND RECLAIMED WATER INFRASTRUCTURE RELATED \nTO THE IH -10 FRONTAGE ROAD PROJECT FROM EXECUTIVE BOULEVARD TO SUNLAND \nPARK DRIVE, WITH A TOTAL PROJECT COST ESTIMATED AT $5,307,371.42 AND AUTHORIZED",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "dcb173e73c5125d5bf99b651"
    },
    {
      "source_page": 4,
      "item_number": "13",
      "evidence": "AWARDED RFP 34 -26 TEXAS STATE GOVERNMENT RELATIONS SERVICES (RE -BID) TO \nHILLCO PARTNERS LLC IN THE ANNUAL AMOUNT OF $144,000 FOR A TERM OF THREE \nYEARS, BEGINNING ON OCTOBER 1, 2026, WITH TWO THREE-YEAR OPTIONS TO EXTEND.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "e45e3ff8cd58658689c38949"
    },
    {
      "source_page": 4,
      "item_number": "14",
      "evidence": "REJECTED THE PROPOSAL RECEIVED FOR ESPERANZA WATER WORKS ELECTRICAL \nIMPROVEMENTS - CSP24-26 AND AUTHORIZED STAFF TO REBID.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "f91c101744746a7712897717"
    },
    {
      "source_page": 4,
      "item_number": "15",
      "evidence": "REJECTED ALL PROPOSALS RECEIVED FOR PUMPING SYSTEMS FURNISH, INSTALLATION \n& MAINTENANCE PHASE 5 - LOW-BID 32-26 AND AUTHORIZED STAFF TO REBID.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "a1e338bf41119d9cbe2f3ca5"
    },
    {
      "source_page": 4,
      "item_number": "16",
      "evidence": "ADOPTED A RESOLUTION AUTHORIZING THE ADDITION OF STAFF AS AN AUTHORIZED \nREPRESENTATIVE OF THE EL PASO WATER UTILITIES PUBLIC SERVICE BOARD FOR THE \nLOGIC AND TEXSTAR ACCOUNTS; AND AUTHORIZED THE PSB CHAIR AND SECRETARY-\nTREASURER TO SIGN RELATED DOCUMENTS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "67b219af66f2d20cd0dc0439"
    },
    {
      "source_page": 4,
      "item_number": "17",
      "evidence": "ADOPTED A RESOLUTION AUTHORIZING THE ADDITION OF STAFF AS AN AUTHORIZED \nREPRESENTATIVE OF THE EL PASO WATER UTILITIES PUBLIC SERVICE BOARD FOR THE \nTEXPOOL INVESTMENT POOL ACCOUNTS; AND AUTHORIZED THE PSB CHAIR AND \nSECRETARY-TREASURER TO SIGN RELATED DOCUMENTS. \nREGULAR AGENDA",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "4df9a9c375a6c1f61af55a2e"
    },
    {
      "source_page": 4,
      "item_number": "21",
      "evidence": "AWARDED RFP 14 -26 TECHNICAL GRADE METHANOL TO VALENZ SUPPLY AND \nDISTRIBUTION, LLC TO SUPPLY TECHNICAL GRADE METHANOL ON AN AS -NEEDED BASIS \nFOR AN ANNUAL ESTIMATED AMOUNT OF $1,034,500, FOR A TERM OF ONE YEAR WITH FOUR",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "695508afb22c840aa5ccdac1"
    },
    {
      "source_page": 5,
      "item_number": "22",
      "evidence": "AWARDED RFP 22-26, DISPOSAL OF WASTEWATER SLUDGE AND WATER RESIDUALS SERVICES, \nTO THE TWO HIGHEST-RANKED PROPOSERS, GCC SUN CITY MATERIALS, LLC AND GRAYMAR \nENVIRONMENTAL SERVICES, LLC., FOR EACH VENDOR TO DISPOSE WASTEWATER SLUDGE \nAND WATER TREATMENT RESIDUALS ON AN AS -NEEDED BASIS FOR AN ESTIMATED \nANNUAL AMOUNT OF $7,800,000 FOR GCC SUN CITY MATERIALS, LLC., AND FOR AN \nESTIMATED AMOUNT OF $6,400,000 FOR GRAYMAR ENVIRONMENTAL S ERVICES, LLC. THE \nCONTRACT TERM FOR EACH VENDOR IS FOR A TERM OF FIVE YEARS WITH ONE FIVE-YEAR \nOPTION TO EXTEND; AND AUTHORIZED FUTURE PRICE ADJUSTMENTS BASED ON \nFLUCTUATION IN THE APPLICABLE CONSUMER PRICE INDEX; AND THAT THE PUBLIC \nSERVICE BOARD MAKES THE FOLLOWING FINDINGS:",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "e4f042cec6a430b53c8d2102"
    },
    {
      "source_page": 6,
      "item_number": "23",
      "evidence": "AWARDED A PRECONSTRUCTION SERVICES CONTRACT FOR CONSTRUCTION MANAGER AT-\nRISK FOR THE NORTHEAST WATER AND WASTEWATER UTILITY IMPROVEMENTS (RE-BID)- \nRFP 33 -26, TO SMITHCO CONSTRU CTION, INC., IN THE AMOUNT OF $200,000 AND \nAUTHORIZED FUTURE AMENDMENTS TO BE ISSUED UNDER THIS CONTRACT FOR \nADDITIONAL PRECONSTRUCTION SERVICES IN THE ESTIMATED AMOUNT OF $150,000. \nAdriana Castillo, provided a presentation to the Board regarding this item  (copy on file in Central Files.) EPWater has \ncapital improvement projects to install six major improvement work packages identified as Loma Real Storage Tank & \nPump Sation, Franklin East 1B Tank & Transmission Main, Northeast Franklin Transmission Main Ph. 2, Northeast \nFranklin Water Main Ph. 3, TxDOT Borderland Expressway Phase 2 and Phase 3 Water System Relocations, and \nNortheast Dyer/RR Force Main. EPWater decided to combine all projects and delivered using CMAR procurement \nmethod.  \n \nThis item is to req uest award of a Preconstruction Services Agreement with Smithco Construction Inc as the selected \nCMAR for the project. Under this contract, the CMAR will collaborate and cooperate with EPWater and the design \nengineers for the to finalize the design, perform field investigations, prepare a construction cost estimate, develop the \nproject schedule, and advise on project constructability and sequencing of the work. The CMAR contractor will procure \nlong lead time materials and the trade bid packages for construction and develop Guaranteed Maximum Price (GMPs) \nproposals to construct the project. If the GMPs proposals are acceptable to EPWater staff, an award of the construction \ncontract will be presented to the Public Service Board for approval. Multiple GMPs are anticipated for this project.  \n \nOn a motion made by Mayor Johnson, seconded by Dr. Ocaranza , and unanimously carried, the Board awarded a \npreconstruction services contract for Construction Manager At- Risk for the Northeast Water and Wastewater Utility \nImprovements (Re-Bid)- RFP 33-26, to Smithco Construction, Inc., in the amount of $200,000 and authorized future \namendments to be issued under this contract for additional preconstruction services in the estimated amount of \n$150,000.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "fdb517de15683528a5dfc35d"
    },
    {
      "source_page": 6,
      "item_number": "24",
      "evidence": "APPROVED AMENDMENT NUMBER 1 TO THE PROFESSIONAL ENGINEERING SERVICES \nCONTRACT FOR THE EAST HIGH AND FRANKLIN EAST 1 PRESSURE ZONE IMPROVEMENTS \nPROJECT WITH CONSOR NORTH AMERICA INC., FOR ADDITIONAL PROFESSIONAL \nENGINEERING SERVICES IN THE AMOUNT OF $1,692,307.12; AND AUTHORIZED FUTURE TASK \nORDERS OR AMENDMENTS TO BE ISSUED UNDER THIS CONTRACT FOR ADDITIONAL \nENGINEERING SERVICES AND CONSTRUCTION PHASE SERVICES IN THE AMOUNT OF \n$1,000,000 AND EXTEND THE TERM OF THE CONTRACT BY TWO YEARS. \nAdriana Castillo, provided a presentation to the Board regarding this item (copy on file in Central Files.) EPWater has \ncapital improvement projects to install six major improvement work packages identified as Loma Real Storage Tank & \nPump Sation, Franklin East 1B Tank & Transmission Main, Northeast Franklin Transmission Main Ph. 2, Northeast \nFranklin Water Main Ph. 3, TxDOT Borderland Expressway Phase 2 and Phase 3 Water System Relocations, and \nNortheast Dyer/RR Force Main. EPWater decided to combine all projects and deliver using Construction Management \nat Risk (CMAR) for the Northeast Water and Wastewater Utility Improvements CMAR.  \n \nConsor North America Inc. (Consor) is the engineer of record on four of the six work packages as part of the East High \nand Franklin East 1 Pressure Zone Improvements. Consor was selected through RFS 54-22 for professional engineering \nservices related to the East High and Franklin East 1 Pressure Zone Improvements. There is a need for an amendment \nto the contract with Consor for the additional services. Consor will provide the preconstruction, program manager and",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "542f3a34cfb19803db9ec7ee"
    },
    {
      "source_page": 7,
      "item_number": "25",
      "evidence": "APPROVED AN AMENDMENT TO THE  CONSTRUCTION MANAGER AT -RISK (CMAR) \nCONSTRUCTION CONTRACT WITH PCL/SUNDT, A JOINT VENTURE, FOR THE ROBERTO \nBUSTAMANTE WASTEWATER TREATMENT PLANT EXPANSION AND IMPROVEMENTS \nPROJECT AND ACCEPT GUARANTEED MAXIMUM PRICE NUMBER 10 (GMP 10) IN THE \nAMOUNT OF $40,096,434. \nIvan Hernandez, provided a presentation to the Board regarding this item (copy on file in Central Files.) The Roberto \nBustamante Wastewater Treatment Plant was designed for a treatment flow capacity of 39 Million Gallons per Day \n(MGD) in 1991. A study conducted in 2019 revealed that the organic treatment capacity of the plant has been reduced \nto 30 MGD due to increased strength of the wastewater. Further, the Texas Commission on Environmental Quality \n(TCEQ) requires planning an expansion of the wastewater treatment plant once 75% of the plant’s flow capacity is \nexceeded for three consecutive months. In addition to the lower treatment capacity, the Roberto Bustamante Wastewater \nTreatment Plant has reached 75% of the permitted flow capacity due to gr owth in east El Paso, requiring EPWater to \nexpand the plant to an increased capacity of 51 MGD. \n \nThe project is divided into two phases. Phase 1 involves the construction of a new 21.4 MGD treatment train. Phase 2 \nincludes the rehabilitation of the existing 39 MGD infrastructure to restore 9 MGD of treatment capacity. Upon \ncompletion of both phases, the Roberto Bustamante Wastewater Treatment Plant will gain a total of 30.4 MGD in \ntreatment capacity. \n \nThis agenda item requests approval of GMP 10 for Phase 1 of the project. The GMP 10 scope generally includes building \nsystems, site utility, and equipment-related improvements associated with the Phase 1 expansion, including work under \nDivision 06 (Wood, Plastics & Composites), Division 08 (Openings), Division 14 (Conveying Equipment), Division 33 \n(Utilities), and Division 41 (Cranes and Hoists), along with additional General Conditions expenses.  \n \nOn a motion made by Mr. Morris, seconded by Mr. Gaddy, and unanimously carried, the Board approved an amendment \nto the Construction Manager At-Risk (CMAR) construction contract with PCL/Sundt, a joint venture, for the Roberto \nBustamante Wastewater Treatment Plant Expansion and Improvements project and accept Guaranteed Maximum Price \nNumber 10 (GMP 10) in the amount of $40,096,434.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "70b31853f68349393d074b45"
    },
    {
      "source_page": 7,
      "item_number": "26",
      "evidence": "DISCUSSED AND TOOK ACTION ON THE ADOPTION OF A RESOLUTION AMENDING \nEPWATER RULES AND REGULATIONS NO. 10 ESTABLISHING THE INVESTMENT POLICY FOR \nTHE PUBLIC SERVICE BOARD WITH THE PROPOSED CHANGES. \n \nBecky Hart, provided a presentation to the Board regarding this item (copy on file in Central Files.) Staff is presenting \nproposed updates to Rule No. 10. The proposed revisions are intended to authorize a qualified nonprofit organization \nor charitable foundation to administer and invest designated public-purpose funds in accordance with the Texas Public \nFunds Investment Act, Texas Government Code Chapter 2256. \n \nOn a motion made by Mayor Johnson, seconded by Mr. Intebi, and unanimously carried, the Board discussed and \ntook action on the adoption of a resolution amending EPWater Rules and Regulations No. 10 Establishing the",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "7bf4113b0e9f622793b5d494"
    },
    {
      "source_page": 8,
      "item_number": "28",
      "evidence": "APPROVED THE PROPOSED MEETINGS SCHEDULE FOR THE STORMWATER, WATER, \nWASTEWATER, AND RECLAIMED WATER ANNUAL BUDGET FOR FISCAL YEAR 2027 -2028 AND \nRULES AND REGULATION CHANGES. \n \nThe Board discussed the proposed meetings schedule for the Stormwater, Water, Wastewater, and Reclaimed Water \nAnnual Budget for Fiscal Year 2027-2028 and Rules and Regulation changes. Board members requested revisions to the \nproposed schedule and asked staff additional questions regarding the item. Staff was directed to make the requested \nchanges and bring the item back to the Board for consideration at the next regularly scheduled meeting.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "90c6015415d371426ed018e8"
    },
    {
      "source_page": 8,
      "item_number": "29",
      "evidence": "DISCUSSED AND TOOK ACTION ON THE REQUEST OF BROCK & BUSTILLOS FOR A VARIANCE \nTO RULES AND REGULATIONS NO. 7 AND NO. 11 RELATED TO THE PROPOSED STANDBY FIRE \nPROTECTION SERVICE FOR THE DEVELOPMENT LOCATED AT 923 LA MESA.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026-1.pdf",
      "source_sha256": "81f96f5de4b5eb5caddc102068b9433d83502c57be1b09560bf3ba824f8fa6f8",
      "id": "bbf1ec7bc8e60741638866cd"
    },
    {
      "source_page": 2,
      "item_number": "1",
      "evidence": "APPROVED THE MINUTES OF THE REGULARLY SCHEDULED MEETING HELD ON JULY 8,",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "8428aa417ac191375ac48410"
    },
    {
      "source_page": 2,
      "item_number": "2",
      "evidence": "ADOPTED A RESOLUTION AUTHORIZING THE PRESIDENT/CEO OR DESIGNEE TO \nSUBMIT A GRANT APPLICATION TO THE U.S. BUREAU OF RECLAMATION UNDER THE \nTITLE XVI WATER RECLAMATION AND REUSE PROJECTS GRANT OPPORTUNITY IN THE \nAMOUNT OF $6,000,000 FOR THE PURE WATER CENTER PROJECT, FORMERLY ADVANCED \nWATER PURIFICATION FACILITY; AUTHORIZED EPWATER'S FUNDING COMMITMENT OF \nUP TO $18,000,000 NON-FEDERAL MATCH IF GRANT FUNDS ARE AWARDED; AND FURTHER \nAUTHORIZE THE PRESIDENT/CEO OR DESIGNEE TO PROVIDE AND SIGN ANY \nDOCUMENTS IN CONNECTION WITH THE GRANT APPLICATION, GRANT AGREEMENT, \nAND ACCEPTANCE OF FUNDS FOR THIS PROJECT.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "d2cf670e1adc9bf16e49cf43"
    },
    {
      "source_page": 2,
      "item_number": "3",
      "evidence": "APPROVED A SOLE SOURCE AGREEMENT WITH BADGERMETER, INC. PURSUANT TO \nSECTION 252.022(A)(7)(A) AND (D) OF THE TEXAS LOCAL GOVERNMENT CODE FOR THE \nADVANCED MONITORING OF THE WASTEWATER COLLECTION SYSTEM, FOR AN \nESTIMATED ANNUAL AMOUNT OF $1,000,000 FOR A TERM OF ONE YEAR WITH FOUR ONE-\nYEAR OPTIONS TO EXTEND CONTINGENT UPON THE VENDOR PROVIDING YEARLY \nDOCUMENTATION ATTESTING TO THEIR SOLE SOURCE STATUS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "fab868a018436dbb24e6159d"
    },
    {
      "source_page": 2,
      "item_number": "4",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT \nISSUED TO MSC INDUSTRIAL DIRECT CO., INC., THROUGH THE PURCHASING \nCOOPERATIVE GSA CONTRACT NO. 47QSHA18D002C FOR MAINTENANCE, REPAIR, AND \nOPERATIONS (MRO) SUPPLIES AND SERVICES, BY AN ADDITIONAL $500,000 FOR A \nCUMULATIVE CONTRACT AMOUNT OF $1,000,000 AND AUTHO RIZED THE ISSUANCE OF",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "36b61e8b4cd42fd9afe5993e"
    },
    {
      "source_page": 3,
      "item_number": "5",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT \nISSUED TO HACH COMPANY THROUGH THE GSA PURCHASING COOPERATIVE CONTRACT \nNO. 47QSMS26D0027, BY AN ADDITIONAL $1,000,000 FOR A CUMULATIVE CONTRACT \nAMOUNT OF $1,500,000 AND AUTHORIZED THE ISSUANCE OF FUTURE ANNUAL MASTER \nCONTRACTS IN THE ESTIMATED AMOUNT OF $1,500,000 FOR AS LONG AS THE  TERM OF \nTHE COOPERATIVE CONTRACT REMAINS IN PLACE.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "b26d32d2d9890c419cb1ea61"
    },
    {
      "source_page": 3,
      "item_number": "6",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT \nISSUED TO EL PASO PHOENIX PUMPS, INC. THROUGH THE PURCHASING COOPERATIVE \nESC REGION 19 CONTRACT NO. 26-7551, BY AN ADDITIONAL $1,500,000 FOR A CUMULATIVE \nCONTRACT AMOUNT TO $2,000,000 AND AUTHORIZED THE ISSUANCE OF FUTURE \nANNUAL MASTER CONTRACTS IN THE ESTIMATED AMOUNT OF $2,000,000 FOR AS LONG \nAS THE TERM OF THE COOPERATIVE CONTRACT REMAINS IN PLACE.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "e329812fed0e23a2d18f9533"
    },
    {
      "source_page": 3,
      "item_number": "7",
      "evidence": "AWARDED PROFESSIONAL ENGINEER ING SERVICES CONTRACTS FOR ON -CALL \nCONSTRUCTION MANAGEMENT SERVICES FOR VARIOUS WATER, WASTEWATER, \nRECLAIMED WATER, AND STORMWATER CONSTRUCTION PROJECTS – RFQ 19 -26 TO \nARCADIS U.S., INC., BROWN AND CALDWELL, CEA ENGINEERING GROUP, INC., CDM \nSMITH INC., CONSOR NORTH AMERICA, INC, FREESE AND NICHOLS, INC., GARVER, LLC, \nH2O TERRA, LLC, HUITT -ZOLLARS, INC., JACOBS ENGINEERING GROUP INC., JOHNSON, \nMIRMIRAN & THOMPSON, INC., AND MORENO CARDENAS, INC. FOR AN AMOUNT NOT TO \nEXCEED $1,500,000 FOR EACH FIRM FOR A TERM OF THREE YEARS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "78ed635580b3813fc6749e37"
    },
    {
      "source_page": 3,
      "item_number": "8",
      "evidence": "AWARDED A PROFESSIONAL ENGINEERING SERVICES CONTRACT TO CONSOR NORTH \nAMERICA INC., FOR THE WATER DISTRIBUTION ASSESSMENT - RFS 02-26 IN THE AMOUNT \nOF $522,294.24 AND AUTHORIZED FUTURE TASK ORDERS OR AMENDMENTS TO BE ISSUED \nUNDER THIS CONTRACT FOR ADDITIONAL ENGINEERING SERVICES IN THE ESTIMATED \nAMOUNT OF $500,000.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "82652b7f7b874e83c6c1ef34"
    },
    {
      "source_page": 3,
      "item_number": "9",
      "evidence": "AWARDED A PROFESSIONAL ENGINEERING SERVICES CONTRACT TO BATH GROUP, LLC \nFOR THE JOE CARO PUMP STATION REPLACEMENT - PART 2 PROJECT IN THE AMOUNT \nOF $434,490 AND AUTHORIZE D FUTURE TASK ORDERS OR AMENDMENTS TO BE ISSUED \nUNDER THIS CONTRACT FOR ADDITIONAL CONSTRUCTION PHASE SERVICES IN AN \nESTIMATED AMOUNT OF $500,000.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "6c68393f87cec6a4561958c4"
    },
    {
      "source_page": 3,
      "item_number": "10",
      "evidence": "APPROVED CHANGE ORDER NUMBER 2 FOR CSP 08 -24 HEATH DE LEON PUMP WITH \nSMITHCO CONSTRUCTION INC., IN THE A MOUNT OF $2,194,212.11 AND INCREASING THE \nCONTRACT TIME BY 240 CALENDAR DAYS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "9fff7e15b1642a29a099d30e"
    },
    {
      "source_page": 3,
      "item_number": "11",
      "evidence": "APPROVED CHANGE ORDER NUMBER 4 FOR BID NO. 35-22, CROWN POINT II AND NEVINS \nPACKED TOWER AIR STRIPPERS WITH MORROW ENTERPRISES INC, IN THE AMOUNT OF \n$154,820.98 AND INCREASING THE CONTRACT TIME BY 480 CALENDAR DAYS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "b725cebed37ccb92a57cf34b"
    },
    {
      "source_page": 3,
      "item_number": "12",
      "evidence": "AUTHORIZED THE PRESIDENT/CEO OR DESIGNEE TO SIGN A STANDARD UTILITY \nAGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION FOR THE \nRELOCATION OF WASTEWATER AND RECLAIMED WATER INFRASTRUCTURE RELATED \nTO THE IH -10 FRONTAGE ROAD PROJECT FROM EXECUTIVE BOULEVARD TO SUNLAND \nPARK DRIVE, WITH A TOTAL PROJECT COST ESTIMATED AT $5,307,371.42 AND AUTHORIZED",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "54727e450e6b050366cba17b"
    },
    {
      "source_page": 4,
      "item_number": "13",
      "evidence": "AWARDED RFP 34 -26 TEXAS STATE GOVERNMENT RELATIONS SERVICES (RE -BID) TO \nHILLCO PARTNERS LLC IN THE ANNUAL AMOUNT OF $144,000 FOR A TERM OF THREE \nYEARS, BEGINNING ON OCTOBER 1, 2026, WITH TWO THREE-YEAR OPTIONS TO EXTEND.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "f2b89a9f9bb0c0d600b9558a"
    },
    {
      "source_page": 4,
      "item_number": "14",
      "evidence": "REJECTED THE PROPOSAL RECEIVED FOR ESPERANZA WATER WORKS ELECTRICAL \nIMPROVEMENTS - CSP24-26 AND AUTHORIZED STAFF TO REBID.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "d51cc9df0e34a56847ac1038"
    },
    {
      "source_page": 4,
      "item_number": "15",
      "evidence": "REJECTED ALL PROPOSALS RECEIVED FOR PUMPING SYSTEMS FURNISH, INSTALLATION \n& MAINTENANCE PHASE 5 - LOW-BID 32-26 AND AUTHORIZED STAFF TO REBID.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "9c5ac403bc0d8c8173314074"
    },
    {
      "source_page": 4,
      "item_number": "16",
      "evidence": "ADOPTED A RESOLUTION AUTHORIZING THE ADDITION OF STAFF AS AN AUTHORIZED \nREPRESENTATIVE OF THE EL PASO WATER UTILITIES PUBLIC SERVICE BOARD FOR THE \nLOGIC AND TEXSTAR ACCOUNTS; AND AUTHORIZED THE PSB CHAIR AND SECRETARY-\nTREASURER TO SIGN RELATED DOCUMENTS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "85d4c45ad48236a4d354b6c4"
    },
    {
      "source_page": 4,
      "item_number": "17",
      "evidence": "ADOPTED A RESOLUTION AUTHORIZING THE ADDITION OF STAFF AS AN AUTHORIZED \nREPRESENTATIVE OF THE EL PASO WATER UTILITIES PUBLIC SERVICE BOARD FOR THE \nTEXPOOL INVESTMENT POOL ACCOUNTS; AND AUTHORIZED THE PSB CHAIR AND \nSECRETARY-TREASURER TO SIGN RELATED DOCUMENTS. \nREGULAR AGENDA",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "7464bb59ff0f12477632816f"
    },
    {
      "source_page": 4,
      "item_number": "21",
      "evidence": "AWARDED RFP 14 -26 TECHNICAL GRADE METHANOL TO VALENZ SUPPLY AND \nDISTRIBUTION, LLC TO SUPPLY TECHNICAL GRADE METHANOL ON AN AS -NEEDED BASIS \nFOR AN ANNUAL ESTIMATED AMOUNT OF $1,034,500, FOR A TERM OF ONE YEAR WITH FOUR",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "1b8c20bf504382bf220bb933"
    },
    {
      "source_page": 5,
      "item_number": "22",
      "evidence": "AWARDED RFP 22-26, DISPOSAL OF WASTEWATER SLUDGE AND WATER RESIDUALS SERVICES, \nTO THE TWO HIGHEST-RANKED PROPOSERS, GCC SUN CITY MATERIALS, LLC AND GRAYMAR \nENVIRONMENTAL SERVICES, LLC., FOR EACH VENDOR TO DISPOSE WASTEWATER SLUDGE \nAND WATER TREATMENT RESIDUALS ON AN AS -NEEDED BASIS FOR AN ESTIMATED \nANNUAL AMOUNT OF $7,800,000 FOR GCC SUN CITY MATERIALS, LLC., AND FOR AN \nESTIMATED AMOUNT OF $6,400,000 FOR GRAYMAR ENVIRONMENTAL S ERVICES, LLC. THE \nCONTRACT TERM FOR EACH VENDOR IS FOR A TERM OF FIVE YEARS WITH ONE FIVE-YEAR \nOPTION TO EXTEND; AND AUTHORIZED FUTURE PRICE ADJUSTMENTS BASED ON \nFLUCTUATION IN THE APPLICABLE CONSUMER PRICE INDEX; AND THAT THE PUBLIC \nSERVICE BOARD MAKES THE FOLLOWING FINDINGS:",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "3594ea0338011a392fbf9103"
    },
    {
      "source_page": 6,
      "item_number": "23",
      "evidence": "AWARDED A PRECONSTRUCTION SERVICES CONTRACT FOR CONSTRUCTION MANAGER AT-\nRISK FOR THE NORTHEAST WATER AND WASTEWATER UTILITY IMPROVEMENTS (RE-BID)- \nRFP 33 -26, TO SMITHCO CONSTRU CTION, INC., IN THE AMOUNT OF $200,000 AND \nAUTHORIZED FUTURE AMENDMENTS TO BE ISSUED UNDER THIS CONTRACT FOR \nADDITIONAL PRECONSTRUCTION SERVICES IN THE ESTIMATED AMOUNT OF $150,000. \nAdriana Castillo, provided a presentation to the Board regarding this item  (copy on file in Central Files.) EPWater has \ncapital improvement projects to install six major improvement work packages identified as Loma Real Storage Tank & \nPump Sation, Franklin East 1B Tank & Transmission Main, Northeast Franklin Transmission Main Ph. 2, Northeast \nFranklin Water Main Ph. 3, TxDOT Borderland Expressway Phase 2 and Phase 3 Water System Relocations, and \nNortheast Dyer/RR Force Main. EPWater decided to combine all projects and delivered using CMAR procurement \nmethod.  \n \nThis item is to req uest award of a Preconstruction Services Agreement with Smithco Construction Inc as the selected \nCMAR for the project. Under this contract, the CMAR will collaborate and cooperate with EPWater and the design \nengineers for the to finalize the design, perform field investigations, prepare a construction cost estimate, develop the \nproject schedule, and advise on project constructability and sequencing of the work. The CMAR contractor will procure \nlong lead time materials and the trade bid packages for construction and develop Guaranteed Maximum Price (GMPs) \nproposals to construct the project. If the GMPs proposals are acceptable to EPWater staff, an award of the construction \ncontract will be presented to the Public Service Board for approval. Multiple GMPs are anticipated for this project.  \n \nOn a motion made by Mayor Johnson, seconded by Dr. Ocaranza , and unanimously carried, the Board awarded a \npreconstruction services contract for Construction Manager At- Risk for the Northeast Water and Wastewater Utility \nImprovements (Re-Bid)- RFP 33-26, to Smithco Construction, Inc., in the amount of $200,000 and authorized future \namendments to be issued under this contract for additional preconstruction services in the estimated amount of \n$150,000.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "0d1812f84767a13429bd609b"
    },
    {
      "source_page": 6,
      "item_number": "24",
      "evidence": "APPROVED AMENDMENT NUMBER 1 TO THE PROFESSIONAL ENGINEERING SERVICES \nCONTRACT FOR THE EAST HIGH AND FRANKLIN EAST 1 PRESSURE ZONE IMPROVEMENTS \nPROJECT WITH CONSOR NORTH AMERICA INC., FOR ADDITIONAL PROFESSIONAL \nENGINEERING SERVICES IN THE AMOUNT OF $1,692,307.12; AND AUTHORIZED FUTURE TASK \nORDERS OR AMENDMENTS TO BE ISSUED UNDER THIS CONTRACT FOR ADDITIONAL \nENGINEERING SERVICES AND CONSTRUCTION PHASE SERVICES IN THE AMOUNT OF \n$1,000,000 AND EXTEND THE TERM OF THE CONTRACT BY TWO YEARS. \nAdriana Castillo, provided a presentation to the Board regarding this item (copy on file in Central Files.) EPWater has \ncapital improvement projects to install six major improvement work packages identified as Loma Real Storage Tank & \nPump Sation, Franklin East 1B Tank & Transmission Main, Northeast Franklin Transmission Main Ph. 2, Northeast \nFranklin Water Main Ph. 3, TxDOT Borderland Expressway Phase 2 and Phase 3 Water System Relocations, and \nNortheast Dyer/RR Force Main. EPWater decided to combine all projects and deliver using Construction Management \nat Risk (CMAR) for the Northeast Water and Wastewater Utility Improvements CMAR.  \n \nConsor North America Inc. (Consor) is the engineer of record on four of the six work packages as part of the East High \nand Franklin East 1 Pressure Zone Improvements. Consor was selected through RFS 54-22 for professional engineering \nservices related to the East High and Franklin East 1 Pressure Zone Improvements. There is a need for an amendment \nto the contract with Consor for the additional services. Consor will provide the preconstruction, program manager and",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "d8d468772b9c0592ec654b7e"
    },
    {
      "source_page": 7,
      "item_number": "25",
      "evidence": "APPROVED AN AMENDMENT TO THE  CONSTRUCTION MANAGER AT -RISK (CMAR) \nCONSTRUCTION CONTRACT WITH PCL/SUNDT, A JOINT VENTURE, FOR THE ROBERTO \nBUSTAMANTE WASTEWATER TREATMENT PLANT EXPANSION AND IMPROVEMENTS \nPROJECT AND ACCEPT GUARANTEED MAXIMUM PRICE NUMBER 10 (GMP 10) IN THE \nAMOUNT OF $40,096,434. \nIvan Hernandez, provided a presentation to the Board regarding this item (copy on file in Central Files.) The Roberto \nBustamante Wastewater Treatment Plant was designed for a treatment flow capacity of 39 Million Gallons per Day \n(MGD) in 1991. A study conducted in 2019 revealed that the organic treatment capacity of the plant has been reduced \nto 30 MGD due to increased strength of the wastewater. Further, the Texas Commission on Environmental Quality \n(TCEQ) requires planning an expansion of the wastewater treatment plant once 75% of the plant’s flow capacity is \nexceeded for three consecutive months. In addition to the lower treatment capacity, the Roberto Bustamante Wastewater \nTreatment Plant has reached 75% of the permitted flow capacity due to gr owth in east El Paso, requiring EPWater to \nexpand the plant to an increased capacity of 51 MGD. \n \nThe project is divided into two phases. Phase 1 involves the construction of a new 21.4 MGD treatment train. Phase 2 \nincludes the rehabilitation of the existing 39 MGD infrastructure to restore 9 MGD of treatment capacity. Upon \ncompletion of both phases, the Roberto Bustamante Wastewater Treatment Plant will gain a total of 30.4 MGD in \ntreatment capacity. \n \nThis agenda item requests approval of GMP 10 for Phase 1 of the project. The GMP 10 scope generally includes building \nsystems, site utility, and equipment-related improvements associated with the Phase 1 expansion, including work under \nDivision 06 (Wood, Plastics & Composites), Division 08 (Openings), Division 14 (Conveying Equipment), Division 33 \n(Utilities), and Division 41 (Cranes and Hoists), along with additional General Conditions expenses.  \n \nOn a motion made by Mr. Morris, seconded by Mr. Gaddy, and unanimously carried, the Board approved an amendment \nto the Construction Manager At-Risk (CMAR) construction contract with PCL/Sundt, a joint venture, for the Roberto \nBustamante Wastewater Treatment Plant Expansion and Improvements project and accept Guaranteed Maximum Price \nNumber 10 (GMP 10) in the amount of $40,096,434.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "aa4fa7bcbb2a31c5d0ae0053"
    },
    {
      "source_page": 7,
      "item_number": "26",
      "evidence": "DISCUSSED AND TOOK ACTION ON THE ADOPTION OF A RESOLUTION AMENDING \nEPWATER RULES AND REGULATIONS NO. 10 ESTABLISHING THE INVESTMENT POLICY FOR \nTHE PUBLIC SERVICE BOARD WITH THE PROPOSED CHANGES. \n \nBecky Hart, provided a presentation to the Board regarding this item (copy on file in Central Files.) Staff is presenting \nproposed updates to Rule No. 10. The proposed revisions are intended to authorize a qualified nonprofit organization \nor charitable foundation to administer and invest designated public-purpose funds in accordance with the Texas Public \nFunds Investment Act, Texas Government Code Chapter 2256. \n \nOn a motion made by Mayor Johnson, seconded by Mr. Intebi, and unanimously carried, the Board discussed and \ntook action on the adoption of a resolution amending EPWater Rules and Regulations No. 10 Establishing the",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "e4384c6858810a39e099cd30"
    },
    {
      "source_page": 8,
      "item_number": "28",
      "evidence": "APPROVED THE PROPOSED MEETINGS SCHEDULE FOR THE STORMWATER, WATER, \nWASTEWATER, AND RECLAIMED WATER ANNUAL BUDGET FOR FISCAL YEAR 2027 -2028 AND \nRULES AND REGULATION CHANGES. \n \nThe Board discussed the proposed meetings schedule for the Stormwater, Water, Wastewater, and Reclaimed Water \nAnnual Budget for Fiscal Year 2027-2028 and Rules and Regulation changes. Board members requested revisions to the \nproposed schedule and asked staff additional questions regarding the item. Staff was directed to make the requested \nchanges and bring the item back to the Board for consideration at the next regularly scheduled meeting.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "1028d2e7e1ed3a0bd0cad943"
    },
    {
      "source_page": 8,
      "item_number": "29",
      "evidence": "DISCUSSED AND TOOK ACTION ON THE REQUEST OF BROCK & BUSTILLOS FOR A VARIANCE \nTO RULES AND REGULATIONS NO. 7 AND NO. 11 RELATED TO THE PROPOSED STANDBY FIRE \nPROTECTION SERVICE FOR THE DEVELOPMENT LOCATED AT 923 LA MESA.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/152/item-01-minutes-august-12-2026.pdf",
      "source_sha256": "0ede62ad3af4df156c058dfe3b2f5776dadd8c54e6945cc676f1b01b048ab066",
      "id": "477aab9bda7493883dafe860"
    },
    {
      "source_page": 2,
      "item_number": "1",
      "evidence": "APPROVED THE MINUTES OF THE REGULARLY SCHEDULED MEETING HELD ON AUGUST 12,",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "cbbe62f63624dea2dd82bd5f"
    },
    {
      "source_page": 2,
      "item_number": "2",
      "evidence": "APPROVED A SOLE SOURCE AGREEMENT WITH TGO TECHNOLOGIES INC PURSUANT TO \nSECTION 252.022(A)(7)(A) AND (D) OF THE TEXAS LOCAL GOVERNMENT CODE FOR CHLORINE \nCONTAINMENT SYSTEMS, ASSOCIATED EQUIPMENT, REPLACEMENT PARTS, MAINTENANCE \nSERVICES, AND TECHNICAL SUPPOR T IN THE ESTIMATED ANNUAL AMOUNT OF $2,000,000 \nFOR A TERM OF ONE YEAR WITH FOUR ONE -YEAR OPTIONS TO EXTEND CONTINGENT \nUPON TGO TECHNOLOGIES INC PROVIDING ANNUAL DOCUMENTATION ATTESTING TO \nTHEIR SOLE SOURCE STATUS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "6e9b221139df8b8e8b731c71"
    },
    {
      "source_page": 2,
      "item_number": "3",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT ISSUED \nTO SCHNEIDER ELECTRIC SYSTEMS USA, INC. THROUGH THE PURCHASING COOPERATIVE \nOMNIA PARTNERS CONTRACT NO. R220703 BY AN ADDITIONAL $3,500,000 FOR THE PURCHASE \nOF FACILITY TECHNOLOGY I NTEGRATION & SECURITY SYSTEM SERVICES, FOR A",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "971ab619824b41f5e524bd32"
    },
    {
      "source_page": 3,
      "item_number": "6",
      "evidence": "AWARDED BID 25-26, TOW TRUCK AND RECOVERY SERVICES TO AD WRECKER SERVICE, INC., \nTHE SOLE RESPONSIVE, RESPONSIBLE BIDDER, FOR VEHICLE TOWING AND RECOVERY \nSERVICES ON AN AS-NEEDED BASIS FOR AN ANNUAL ESTIMATED AMOUNT OF $51,569 FOR A \nTERM OF ONE YEAR WITH FOUR ONE-YEAR OPTIONS TO EXTEND.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "e26630694eac1fd01540efb4"
    },
    {
      "source_page": 3,
      "item_number": "7",
      "evidence": "APPROVED CHANGE ORDER NUMBER 1 FOR RFP 56 -15 WASTEWATER SLUDGE AND WATER \nTREATMENT RESIDUAL DISPOSAL WITH GCC SUN CITY MATERIALS, LLC IN THE AMOUNT OF \n$2,418,937.50.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "37f995ba17dbbaf7e81545ba"
    },
    {
      "source_page": 3,
      "item_number": "8",
      "evidence": "APPROVED CHANGE ORDER NUMBER 1 FOR BID NUMBER 63 -24 NORTHEAST AQUIFER \nSTORAGE AND RECOVERY (ASR) ENHANCED ARROYO PHASE 1B WITH ZTEX CONSTRUCTION \nINC. IN THE AMOUNT OF $683,658.50 AND INCREASED THE CONTRACT TIME BY 160 CALENDAR \nDAYS. \nREGULAR AGENDA",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "922970663b2310dabf58840a"
    },
    {
      "source_page": 3,
      "item_number": "4",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT ISSUED \nTO PC AUTOMATED CONTROLS, INC. THROUGH THE PURCHASING COOPERATIVE ESC \nREGION 19 CONTRACT NO. 22 -7434 MAINTENANCE, REPAIR AND OPERATION (MRO) \nEQUIPMENT, SUPPLIES, MATERIALS, AND SER VICES BY AN ADDITIONAL $1,000,000 FOR A \nCUMULATIVE CONTRACT AMOUNT OF $1,500,000. \nAmy Aragon, answer questions from the Board and the public regarding this item (copy on file in Central Files.) A master \ncontract was issued to PC Automated Controls, Inc. through the ESC Region 19 Cooperative Contract No. 22 -7434 \nMaintenance, Repair and Operation (MRO) Equipment, Supplies, Materials, and Services for buil ding automation \nsystems for heating, ventilation, and air conditioning (HVAC) systems pursuant to the delegated authority of the \nPresident/CEO or designee to issue master contracts with awarded vendors participating in approved cooperative \npurchasing programs for an estimated annual amount of $500,000 per individual master contract without further Public \nService Board approval. Additional capacity in the amount of $1,000,000 is needed for PC Automated Controls, Inc. to \nprovide MRO services. \nOn a motion made by Dr. Ocaranza, seconded by Mr. Morris, and unanimously carried, the Board approved an increase \nin the capacity of the existing master contract issued to PC Automated Controls, Inc. through the purchasing cooperative \nESC Region 19 Contract No. 22-7434 Maintenance, Repair and Operation (MRO) Equipment, Supplies, Materials, and \nServices by an additional $1,000,000 for a cumulative contract amount of $1,500,000.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "641fcdb47920001529163d47"
    },
    {
      "source_page": 3,
      "item_number": "5",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT ISSUED \nTO TRANE U.S. INC. THROUGH THE PURCHASING COOPERATIVE ESC REGION 19 CONTRACT \nNO. 22 -7434 FOR MAINTENANCE, REPAIR AND OPERATION (MRO) EQUIPMENT, SUPPLIES, \nMATERIALS, AND SERVICES, B Y AN ADDITIONAL $1,000,000 FOR A CUMULATIVE CONTRACT \nAMOUNT OF $2,000,000. \nAmy Aragon, answer questions from the Board and the public  regarding this item (copy on file in Central Files.) Trane \nprovides maintenance, repair, and operation (MRO) equipment, supplies, materials, and services for heating, ventilation, \nand air conditioning (HVAC) systems in EPWater buildings and facilities. A master contract was issued through the ESC \nRegion 19 Allied States Cooperative Contract No. 22 -7434, Maintenance, Repair and Operation (MRO) Equipment, \nSupplies, Materials and Services to Trane. An additional  $1,000,000 in master contract capacity is needed to support \nanticipated operational requirements.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "2b8a0ff6bd1d76d5b23cf233"
    },
    {
      "source_page": 4,
      "item_number": "12",
      "evidence": "RECEIVED A PRESENTATION AND DISCUSSED THE EMERGENCY AGREEMENT WITH \nVALENZ SUPPLY AND DISTRIBUTION, LLC IN THE AMOUNT OF $194,761.94 FOR THE \nPURCHASE OF TECHNICAL GRADE METHANOL FOR THE FRED HERVEY WATER \nRECLAMATION PLANT APPROVED UNDER THE PRESIDENT/CEO’S DELEGATED AUTHORITY; \nAND THE PUBLIC SERVICE BOARD FOUND THAT THE EMERGENCY AGREEMENT WAS \nNECESSARY TO PROTECT THE PUBLIC HEALTH OR SAFETY OF THE CUSTOMERS PURSUANT \nTO SECTION 252.022(A)(2) OF THE TEXAS LOCAL GOVERNMENT CODE. \nGeoffrey Espineli, provided a presentation to the Board regarding this item (copy on file in Central Files.) Methanol is \nessential to wastewater treatment operations at the Fred Hervey Water Reclamation Plant, where it is used as a carbon \nsource for microorganisms in the nitrogen removal process. A continuous supply of methanol is necessary to maintain \neffective wastewater treatment, regulatory compliance, reliable plant operations, and to protect the public health or safety \nof EPWater customers. \nUpon the expiration of Contract No. 86-22 Technical Grade Methanol, EPWater entered into an emergency agreement \nunder the President/CEO delegated emergency authority for the purchase of technical grade methanol from Valenz \nSupply and Distribution, LLC (Valenz) from October 2025 through July 2026 to prevent an interruption in the supply \nof methanol necessary for wastewater treatment. \nOn a motion made by Mrs. Block, seconded by Mr. Intebi, and unanimously carried, the Board received a presentation \nand discussed the emergency agreement with Valenz Supply and Distribution, LLC in the amount of $194,761.94 for the \npurchase of technical grade methanol for the Fred Hervey Water Reclamation Plant approved under the \nPresident/CEO’s delegated authority; and the Public Service Board found that the emergency agreement was necessary \nto protect the public health or safety of the customers pursuant to Section 252.022(a)(2) of the Texas Local Government \nCode. Mr. Espineli answered questions from the board on this item.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "c02657a599d44079245ffe84"
    },
    {
      "source_page": 5,
      "item_number": "13",
      "evidence": "AWARDED RFP NO. 12 -26, LIQUID FERRIC CHLORIDE, TO THE TWO HIGHEST RANKED \nPROPOSERS KEMIRA WATER SOLUTIONS, INC., AND PENCCO, INC. FOR THE PURCHASE OF \nLIQUID FERRIC CHLORIDE ON AN AS-NEEDED BASIS FOR AN ESTIMATED ANNUAL AMOUNT \nOF $1,046,214 FOR KEMIRA WATER  SOLUTIONS, INC., AND FOR AN ESTIMATED ANNUAL \nAMOUNT OF $1,219,920 FOR PENCCO, INC. THE CONTRACT TERM FOR EACH VENDOR WAS FOR \nA TERM OF ONE YEAR WITH FOUR ONE -YEAR OPTIONS TO EXTEND; AND THE PUBLIC \nSERVICE BOARD MADE THE FOLLOWING FINDINGS:",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "9dd287fbfe23d24d5cc9e01e"
    },
    {
      "source_page": 5,
      "item_number": "14",
      "evidence": "RECEIVED A PRESENTATION AND DISCUSSED THE EMERGENCY AGREEMENT WITH KEMIRA \nWATER SOLUTIONS, INC. IN THE AMOUNT OF $499,534 FOR THE PURCHASE OF LIQUID \nFERRIC CHLORIDE APPROVED UNDER THE PRESIDENT/CEO’S DELEGATED AUTHORITY; \nAND THE PUBLIC SERVICE BOARD FOUND THAT THE EMERGENCY AGREEMENT WAS \nNECESSARY TO PROTECT THE PUBLIC HEALTH OR SAFETY OF CUSTOMERS PURSUANT TO \nSECTION 252.022(A)(2) OF THE TEXAS LOCAL GOVERNMENT CODE. \nAide Fuentes, provided a presentation to the Board regarding  this item (copy on file in Central Files.) Liquid ferric \nchloride is used as a coagulant in the water treatment process at multiple EPWater water treatment plants. The Upper \nValley Water Treatment Plant utilizes liquid ferric chloride year-round, while the Jonathan Rogers Water Treatment Plant \nutilizes liquid ferric chloride seasonally. \nFollowing the expiration of Bid No. 80 -22, EPWater continued to require liquid ferric chloride to maintain  water \ntreatment operations during the summer season. Due to the operational necessity of maintaining an adequate supply of \nliquid ferric chloride for continued water treatment, purchases from Kemira Water Solutions, Inc. continued under an \nemergency agreement under the President/CEO’s delegated authority and pursuant to the state public health or safety \nbid exemption. \nOn a motion made by Mrs. Block, seconded by Mr. Intebi, and unanimously carried, the Board received a presentation \nand discussed the emergency agreement with Kemira Water Solutions, Inc. in the amount of $499,534 for the purchase \nof liquid ferric chloride approved under the President/CEO’s delegated authority ; and the Public Service Board found \nthat the emergency agreement was necessary to protect the public health or safety of customers pursuant to Section \n252.022(a)(2) of the Texas Local Government Code. Mrs. Fuentes answered questions from the board on this item.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "496c0ab9c4def8faeb618435"
    },
    {
      "source_page": 5,
      "item_number": "15",
      "evidence": "AWARDED CSP NO. 17 -26, ON-CALL CONSTRUCTION SERVICES FOR THE REPAIR OF STREET \nRIGHTS-OF-WAY, TO DOUBLE H CONTRACTING, INC., ZTEX CONSTRUCTION, INC., AND",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "47b9844aafb1035fedcaa6bf"
    },
    {
      "source_page": 6,
      "item_number": "16",
      "evidence": "ADOPTED A RESOLUTION TO AWARD BID NUMBER 38 -26, SALE OF REAL ESTATE, OF \nAPPROXIMATELY 3.2627 ACRES, LEGALLY DESCRIBED AS LOT 3, BLOCK 1, HILL TERRACE \nREPLAT NO. 1, CITY OF EL PASO, EL PASO COUNTY, TEXAS, TO THE HIGHEST RESPONSIVE, \nRESPONSIBLE BIDDER, BRIAN J. KLAES, SOLE PROPRIETOR, IN THE AMOUNT OF $142,100, AND \nAUTHORIZED THE PRESIDENT AND CEO TO FORWARD THE RECOMMENDATION TO CITY \nCOUNCIL TO SELL THE LAND AND TO SIGN ANY AND ALL DOCUMENTS NECESSARY TO \nCOMPLETE THE SALE. \nAlejandro Vidales, provided a presentation to the Board regarding this item (copy on file in Central Files.) The property \nconsists of approximately 3.2627 acres, legally described as Lot 3, Block 1, Hill Terrace Replat No. 1, City of El Paso, El \nPaso County, Texas. Based on an appraisal, the Public Service Board established a minimum acceptable bid of $142,000. \n \nOn a motion made by Mrs. Block, seconded by Mr. Intebi, and unanimously carried, the Board adopted a resolution to \naward Bid Number 38 -26, Sale of Real Estate, of approximately 3.2627 acres, legally described as Lot 3, Block 1, Hill \nTerrace Replat No. 1, C ity of El Paso, El Paso County, Texas, to the highest responsive, responsible bidder, Brian J. \nKlaes, Sole Proprietor, in the amount of $142,100, and authorized the President and CEO to forward the \nrecommendation to City Council to sell the land and to sign any and all documents necessary to complete the sale.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "554cfa0190a2ca43097f9a16"
    },
    {
      "source_page": 7,
      "item_number": "17",
      "evidence": "APPROVED THE PROPOSED MEETINGS SCHEDULE FOR THE STORMWATER, WATER, \nWASTEWATER, AND RECLAIMED WATER ANNUAL BUDGET FOR FISCAL YEAR 2027- 2028 AND \nRULES AND REGULATION CHANGES.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "9b94f707198a333beb681b63"
    },
    {
      "source_page": 10,
      "item_number": "1",
      "evidence": "RECEIVED A PRESENTATION AND DISCUSSED THE BUDGET WORKSHOP – FY2027-2028 \nBUDGET OVERVIEW; FY2027 -2028 WATER, WASTEWATER & RECLAIMED WATER OPERATING \nAND CAPITAL IMPROVEMENT BUDGET; FY2027-2028 STORMWATER OPERATING AND CAPITAL \nIMPROVEMENT BUDGET. \nJohn E. Balliew and Gilbert Trejo provided a presentation to the Board regarding this item (copy on file in Central Files.) \nThe presentation reviewed customer water -use trends, bill comparisons, utility operations, strategic pri orities, and \naffordability. Budget challenges included aging infrastructure, higher construction and operating costs, new water supply \nneeds, regulatory requirements, and reliability expectations. Cost -control measures included overtime management, in -\nhouse maintenance, grants, recycling, coordination with partner agencies, and the Asset Reliability program. \nCapital priorities included the Bustamante wastewater treatment plant expansion and rehabilitation, the Pure Water \nCenter, the KBH 6th Treatment Unit, well drilling, pipeline replacement, pumping and lift station improvements, \nstormwater storage and conveyance, and neighborhood drainage. The presentation also addressed projects serving \ngrowing areas, digital transformation, partner-agency obligations, and airport area development. \nFour budget scenarios were presented: High Risk, with a $478 million capital improvement program; Lean, $722 million; \nAccelerated, $1.127 billion; and Strategic, $888 million, compared with $831 million for FY2026-2027. The presentation \ncompared operating and maintenance budgets, debt service and coverage, customer bill impacts, staffing, project \ndeferrals and cancellations, and associated operational, financial, regulatory, legal, and water supply risks. \nAffordability topics included low-water-use rates, stormwater fees, rebates, customer assistance, the AguaRepairs Leak \nRepair Program, a senior discount option for low-water-use customers age 70 and older funded with non-rate revenue, \nand a new mobile application. The Board was asked to consider changes to the scenarios, options for community \nmeetings, and information needed for the second budget workshop.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "3d0498237ba179fa7a7abe34"
    },
    {
      "source_page": 10,
      "item_number": "2",
      "evidence": "DISCUSSED AND NOTED THE FY2027 –2028 BUDGET MEETING SCHEDULE, INCLUDING PSB \nBUDGET WORKSHOP #2 ON NOVEMBER 04, 2026, AT 6:0 0 P.M., AND THE REGULAR PSB \nMEETING ON JANUARY 13, 2027 TO TAKE FINAL ACTION ON THE PROPOSED FY2027-2028 \nBUDGET. \nGilbert Trejo provided a presentation to the Board regarding this item (copy on file in Central Files.) The presentation \nreviewed the FY2027- 2028 budget meeting schedule and community meetings scheduled from October 13, 2026, \nthrough October 22, 2026. Upcoming PSB meetings included October 14, 2026, at 8:30 a.m.; Budget Workshop #2 on",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-1.pdf",
      "source_sha256": "242776ca9bf6456af960cbaadc0bb87532939b4bd8f368832bad6c9ff789d36e",
      "id": "f2c8bef6f99b5065cd9b25ee"
    },
    {
      "source_page": 2,
      "item_number": "1",
      "evidence": "APPROVED THE MINUTES OF THE REGULARLY SCHEDULED MEETING HELD ON AUGUST 12,",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "76a7951ed239ebfdf3d13125"
    },
    {
      "source_page": 2,
      "item_number": "2",
      "evidence": "APPROVED A SOLE SOURCE AGREEMENT WITH TGO TECHNOLOGIES INC PURSUANT TO \nSECTION 252.022(A)(7)(A) AND (D) OF THE TEXAS LOCAL GOVERNMENT CODE FOR CHLORINE \nCONTAINMENT SYSTEMS, ASSOCIATED EQUIPMENT, REPLACEMENT PARTS, MAINTENANCE \nSERVICES, AND TECHNICAL SUPPOR T IN THE ESTIMATED ANNUAL AMOUNT OF $2,000,000 \nFOR A TERM OF ONE YEAR WITH FOUR ONE -YEAR OPTIONS TO EXTEND CONTINGENT \nUPON TGO TECHNOLOGIES INC PROVIDING ANNUAL DOCUMENTATION ATTESTING TO \nTHEIR SOLE SOURCE STATUS.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "56493dbc5cd1b482b17e67f4"
    },
    {
      "source_page": 2,
      "item_number": "3",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT ISSUED \nTO SCHNEIDER ELECTRIC SYSTEMS USA, INC. THROUGH THE PURCHASING COOPERATIVE \nOMNIA PARTNERS CONTRACT NO. R220703 BY AN ADDITIONAL $3,500,000 FOR THE PURCHASE \nOF FACILITY TECHNOLOGY I NTEGRATION & SECURITY SYSTEM SERVICES, FOR A",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "721b96837cb51e26493c2bf7"
    },
    {
      "source_page": 3,
      "item_number": "6",
      "evidence": "AWARDED BID 25-26, TOW TRUCK AND RECOVERY SERVICES TO AD WRECKER SERVICE, INC., \nTHE SOLE RESPONSIVE, RESPONSIBLE BIDDER, FOR VEHICLE TOWING AND RECOVERY \nSERVICES ON AN AS-NEEDED BASIS FOR AN ANNUAL ESTIMATED AMOUNT OF $51,569 FOR A \nTERM OF ONE YEAR WITH FOUR ONE-YEAR OPTIONS TO EXTEND.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "4f33b4e8e7f5243478d44686"
    },
    {
      "source_page": 3,
      "item_number": "7",
      "evidence": "APPROVED CHANGE ORDER NUMBER 1 FOR RFP 56 -15 WASTEWATER SLUDGE AND WATER \nTREATMENT RESIDUAL DISPOSAL WITH GCC SUN CITY MATERIALS, LLC IN THE AMOUNT OF \n$2,418,937.50.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "395bf7ece967d16d76c7beaa"
    },
    {
      "source_page": 3,
      "item_number": "8",
      "evidence": "APPROVED CHANGE ORDER NUMBER 1 FOR BID NUMBER 63 -24 NORTHEAST AQUIFER \nSTORAGE AND RECOVERY (ASR) ENHANCED ARROYO PHASE 1B WITH ZTEX CONSTRUCTION \nINC. IN THE AMOUNT OF $683,658.50 AND INCREASED THE CONTRACT TIME BY 160 CALENDAR \nDAYS. \nREGULAR AGENDA",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "9cab1dd96b920c9573f10579"
    },
    {
      "source_page": 3,
      "item_number": "4",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT ISSUED \nTO PC AUTOMATED CONTROLS, INC. THROUGH THE PURCHASING COOPERATIVE ESC \nREGION 19 CONTRACT NO. 22 -7434 MAINTENANCE, REPAIR AND OPERATION (MRO) \nEQUIPMENT, SUPPLIES, MATERIALS, AND SER VICES BY AN ADDITIONAL $1,000,000 FOR A \nCUMULATIVE CONTRACT AMOUNT OF $1,500,000. \nAmy Aragon, answer questions from the Board and the public regarding this item (copy on file in Central Files.) A master \ncontract was issued to PC Automated Controls, Inc. through the ESC Region 19 Cooperative Contract No. 22 -7434 \nMaintenance, Repair and Operation (MRO) Equipment, Supplies, Materials, and Services for buil ding automation \nsystems for heating, ventilation, and air conditioning (HVAC) systems pursuant to the delegated authority of the \nPresident/CEO or designee to issue master contracts with awarded vendors participating in approved cooperative \npurchasing programs for an estimated annual amount of $500,000 per individual master contract without further Public \nService Board approval. Additional capacity in the amount of $1,000,000 is needed for PC Automated Controls, Inc. to \nprovide MRO services. \nOn a motion made by Dr. Ocaranza, seconded by Mr. Morris, and unanimously carried, the Board approved an increase \nin the capacity of the existing master contract issued to PC Automated Controls, Inc. through the purchasing cooperative \nESC Region 19 Contract No. 22-7434 Maintenance, Repair and Operation (MRO) Equipment, Supplies, Materials, and \nServices by an additional $1,000,000 for a cumulative contract amount of $1,500,000.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "be6e2d3414bdeda3889a9cec"
    },
    {
      "source_page": 3,
      "item_number": "5",
      "evidence": "APPROVED AN INCREASE IN THE CAPACITY OF THE EXISTING MASTER CONTRACT ISSUED \nTO TRANE U.S. INC. THROUGH THE PURCHASING COOPERATIVE ESC REGION 19 CONTRACT \nNO. 22 -7434 FOR MAINTENANCE, REPAIR AND OPERATION (MRO) EQUIPMENT, SUPPLIES, \nMATERIALS, AND SERVICES, B Y AN ADDITIONAL $1,000,000 FOR A CUMULATIVE CONTRACT \nAMOUNT OF $2,000,000. \nAmy Aragon, answer questions from the Board and the public  regarding this item (copy on file in Central Files.) Trane \nprovides maintenance, repair, and operation (MRO) equipment, supplies, materials, and services for heating, ventilation, \nand air conditioning (HVAC) systems in EPWater buildings and facilities. A master contract was issued through the ESC \nRegion 19 Allied States Cooperative Contract No. 22 -7434, Maintenance, Repair and Operation (MRO) Equipment, \nSupplies, Materials and Services to Trane. An additional  $1,000,000 in master contract capacity is needed to support \nanticipated operational requirements.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "4a1b6077f5da4740125cd6ec"
    },
    {
      "source_page": 4,
      "item_number": "12",
      "evidence": "RECEIVED A PRESENTATION AND DISCUSSED THE EMERGENCY AGREEMENT WITH \nVALENZ SUPPLY AND DISTRIBUTION, LLC IN THE AMOUNT OF $194,761.94 FOR THE \nPURCHASE OF TECHNICAL GRADE METHANOL FOR THE FRED HERVEY WATER \nRECLAMATION PLANT APPROVED UNDER THE PRESIDENT/CEO’S DELEGATED AUTHORITY; \nAND THE PUBLIC SERVICE BOARD FOUND THAT THE EMERGENCY AGREEMENT WAS \nNECESSARY TO PROTECT THE PUBLIC HEALTH OR SAFETY OF THE CUSTOMERS PURSUANT \nTO SECTION 252.022(A)(2) OF THE TEXAS LOCAL GOVERNMENT CODE. \nGeoffrey Espineli, provided a presentation to the Board regarding this item (copy on file in Central Files.) Methanol is \nessential to wastewater treatment operations at the Fred Hervey Water Reclamation Plant, where it is used as a carbon \nsource for microorganisms in the nitrogen removal process. A continuous supply of methanol is necessary to maintain \neffective wastewater treatment, regulatory compliance, reliable plant operations, and to protect the public health or safety \nof EPWater customers. \nUpon the expiration of Contract No. 86-22 Technical Grade Methanol, EPWater entered into an emergency agreement \nunder the President/CEO delegated emergency authority for the purchase of technical grade methanol from Valenz \nSupply and Distribution, LLC (Valenz) from October 2025 through July 2026 to prevent an interruption in the supply \nof methanol necessary for wastewater treatment. \nOn a motion made by Mrs. Block, seconded by Mr. Intebi, and unanimously carried, the Board received a presentation \nand discussed the emergency agreement with Valenz Supply and Distribution, LLC in the amount of $194,761.94 for the \npurchase of technical grade methanol for the Fred Hervey Water Reclamation Plant approved under the \nPresident/CEO’s delegated authority; and the Public Service Board found that the emergency agreement was necessary \nto protect the public health or safety of the customers pursuant to Section 252.022(a)(2) of the Texas Local Government \nCode. Mr. Espineli answered questions from the board on this item.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "78503f7245f350c9677eb08b"
    },
    {
      "source_page": 5,
      "item_number": "13",
      "evidence": "AWARDED RFP NO. 12 -26, LIQUID FERRIC CHLORIDE, TO THE TWO HIGHEST RANKED \nPROPOSERS KEMIRA WATER SOLUTIONS, INC., AND PENCCO, INC. FOR THE PURCHASE OF \nLIQUID FERRIC CHLORIDE ON AN AS-NEEDED BASIS FOR AN ESTIMATED ANNUAL AMOUNT \nOF $1,046,214 FOR KEMIRA WATER  SOLUTIONS, INC., AND FOR AN ESTIMATED ANNUAL \nAMOUNT OF $1,219,920 FOR PENCCO, INC. THE CONTRACT TERM FOR EACH VENDOR WAS FOR \nA TERM OF ONE YEAR WITH FOUR ONE -YEAR OPTIONS TO EXTEND; AND THE PUBLIC \nSERVICE BOARD MADE THE FOLLOWING FINDINGS:",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "cc9492294af4fc923cb5cfff"
    },
    {
      "source_page": 5,
      "item_number": "14",
      "evidence": "RECEIVED A PRESENTATION AND DISCUSSED THE EMERGENCY AGREEMENT WITH KEMIRA \nWATER SOLUTIONS, INC. IN THE AMOUNT OF $499,534 FOR THE PURCHASE OF LIQUID \nFERRIC CHLORIDE APPROVED UNDER THE PRESIDENT/CEO’S DELEGATED AUTHORITY; \nAND THE PUBLIC SERVICE BOARD FOUND THAT THE EMERGENCY AGREEMENT WAS \nNECESSARY TO PROTECT THE PUBLIC HEALTH OR SAFETY OF CUSTOMERS PURSUANT TO \nSECTION 252.022(A)(2) OF THE TEXAS LOCAL GOVERNMENT CODE. \nAide Fuentes, provided a presentation to the Board regarding  this item (copy on file in Central Files.) Liquid ferric \nchloride is used as a coagulant in the water treatment process at multiple EPWater water treatment plants. The Upper \nValley Water Treatment Plant utilizes liquid ferric chloride year-round, while the Jonathan Rogers Water Treatment Plant \nutilizes liquid ferric chloride seasonally. \nFollowing the expiration of Bid No. 80 -22, EPWater continued to require liquid ferric chloride to maintain  water \ntreatment operations during the summer season. Due to the operational necessity of maintaining an adequate supply of \nliquid ferric chloride for continued water treatment, purchases from Kemira Water Solutions, Inc. continued under an \nemergency agreement under the President/CEO’s delegated authority and pursuant to the state public health or safety \nbid exemption. \nOn a motion made by Mrs. Block, seconded by Mr. Intebi, and unanimously carried, the Board received a presentation \nand discussed the emergency agreement with Kemira Water Solutions, Inc. in the amount of $499,534 for the purchase \nof liquid ferric chloride approved under the President/CEO’s delegated authority ; and the Public Service Board found \nthat the emergency agreement was necessary to protect the public health or safety of customers pursuant to Section \n252.022(a)(2) of the Texas Local Government Code. Mrs. Fuentes answered questions from the board on this item.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "89bb01e72096e1105db8a6b4"
    },
    {
      "source_page": 5,
      "item_number": "15",
      "evidence": "AWARDED CSP NO. 17 -26, ON-CALL CONSTRUCTION SERVICES FOR THE REPAIR OF STREET \nRIGHTS-OF-WAY, TO DOUBLE H CONTRACTING, INC., ZTEX CONSTRUCTION, INC., AND",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "2fe209215f167268b7270be9"
    },
    {
      "source_page": 6,
      "item_number": "16",
      "evidence": "ADOPTED A RESOLUTION TO AWARD BID NUMBER 38 -26, SALE OF REAL ESTATE, OF \nAPPROXIMATELY 3.2627 ACRES, LEGALLY DESCRIBED AS LOT 3, BLOCK 1, HILL TERRACE \nREPLAT NO. 1, CITY OF EL PASO, EL PASO COUNTY, TEXAS, TO THE HIGHEST RESPONSIVE, \nRESPONSIBLE BIDDER, BRIAN J. KLAES, SOLE PROPRIETOR, IN THE AMOUNT OF $142,100, AND \nAUTHORIZED THE PRESIDENT AND CEO TO FORWARD THE RECOMMENDATION TO CITY \nCOUNCIL TO SELL THE LAND AND TO SIGN ANY AND ALL DOCUMENTS NECESSARY TO \nCOMPLETE THE SALE. \nAlejandro Vidales, provided a presentation to the Board regarding this item (copy on file in Central Files.) The property \nconsists of approximately 3.2627 acres, legally described as Lot 3, Block 1, Hill Terrace Replat No. 1, City of El Paso, El \nPaso County, Texas. Based on an appraisal, the Public Service Board established a minimum acceptable bid of $142,000. \n \nOn a motion made by Mrs. Block, seconded by Mr. Intebi, and unanimously carried, the Board adopted a resolution to \naward Bid Number 38 -26, Sale of Real Estate, of approximately 3.2627 acres, legally described as Lot 3, Block 1, Hill \nTerrace Replat No. 1, C ity of El Paso, El Paso County, Texas, to the highest responsive, responsible bidder, Brian J. \nKlaes, Sole Proprietor, in the amount of $142,100, and authorized the President and CEO to forward the \nrecommendation to City Council to sell the land and to sign any and all documents necessary to complete the sale.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "a2b6cc1bd99e406118b1203f"
    },
    {
      "source_page": 7,
      "item_number": "17",
      "evidence": "APPROVED THE PROPOSED MEETINGS SCHEDULE FOR THE STORMWATER, WATER, \nWASTEWATER, AND RECLAIMED WATER ANNUAL BUDGET FOR FISCAL YEAR 2027- 2028 AND \nRULES AND REGULATION CHANGES.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "c2d9dc6500062d20a193218e"
    },
    {
      "source_page": 10,
      "item_number": "1",
      "evidence": "RECEIVED A PRESENTATION AND DISCUSSED THE BUDGET WORKSHOP – FY2027-2028 \nBUDGET OVERVIEW; FY2027 -2028 WATER, WASTEWATER & RECLAIMED WATER OPERATING \nAND CAPITAL IMPROVEMENT BUDGET; FY2027-2028 STORMWATER OPERATING AND CAPITAL \nIMPROVEMENT BUDGET. \nJohn E. Balliew and Gilbert Trejo provided a presentation to the Board regarding this item (copy on file in Central Files.) \nThe presentation reviewed customer water -use trends, bill comparisons, utility operations, strategic pri orities, and \naffordability. Budget challenges included aging infrastructure, higher construction and operating costs, new water supply \nneeds, regulatory requirements, and reliability expectations. Cost -control measures included overtime management, in -\nhouse maintenance, grants, recycling, coordination with partner agencies, and the Asset Reliability program. \nCapital priorities included the Bustamante wastewater treatment plant expansion and rehabilitation, the Pure Water \nCenter, the KBH 6th Treatment Unit, well drilling, pipeline replacement, pumping and lift station improvements, \nstormwater storage and conveyance, and neighborhood drainage. The presentation also addressed projects serving \ngrowing areas, digital transformation, partner-agency obligations, and airport area development. \nFour budget scenarios were presented: High Risk, with a $478 million capital improvement program; Lean, $722 million; \nAccelerated, $1.127 billion; and Strategic, $888 million, compared with $831 million for FY2026-2027. The presentation \ncompared operating and maintenance budgets, debt service and coverage, customer bill impacts, staffing, project \ndeferrals and cancellations, and associated operational, financial, regulatory, legal, and water supply risks. \nAffordability topics included low-water-use rates, stormwater fees, rebates, customer assistance, the AguaRepairs Leak \nRepair Program, a senior discount option for low-water-use customers age 70 and older funded with non-rate revenue, \nand a new mobile application. The Board was asked to consider changes to the scenarios, options for community \nmeetings, and information needed for the second budget workshop.",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "e6d19c563cc349a4a4f70edb"
    },
    {
      "source_page": 10,
      "item_number": "2",
      "evidence": "DISCUSSED AND NOTED THE FY2027 –2028 BUDGET MEETING SCHEDULE, INCLUDING PSB \nBUDGET WORKSHOP #2 ON NOVEMBER 04, 2026, AT 6:0 0 P.M., AND THE REGULAR PSB \nMEETING ON JANUARY 13, 2027 TO TAKE FINAL ACTION ON THE PROPOSED FY2027-2028 \nBUDGET. \nGilbert Trejo provided a presentation to the Board regarding this item (copy on file in Central Files.) The presentation \nreviewed the FY2027- 2028 budget meeting schedule and community meetings scheduled from October 13, 2026, \nthrough October 22, 2026. Upcoming PSB meetings included October 14, 2026, at 8:30 a.m.; Budget Workshop #2 on",
      "review_status": "needs_review",
      "caveat": "Page-local extraction; consult the PDF for continuations. Mentioned amounts are not summed or treated as payments.",
      "source_url": "https://www.epwater.org/ep-water/assets/files/meetings/154/item-01-minutes-september-9-2026-september-30-2026-2-1.pdf",
      "source_sha256": "dd457abe12c63ded5087c9a53bc6ed820c39cfaff3d3dba9f37a6deef1f43a3b",
      "id": "6c0a32dff7aad7e5f7afe9ca"
    }
  ],
  "record_count": 82
}