Search current project status beside the dated accounting snapshot. The timeline does not imply that current status and historical spending were reported at the same time.
City of El Paso · G7145CD65 · Pre-Design
YWCA Shirley Leavell Branch Rehabilitation
$0 historical expenditures · $163,685 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 3 · Official evidence · p. 20
City of El Paso · PCP09MT0070 · Bidding
Northgate Transit Oriented Development - Floodplain Mitigation
$1,123,559 historical expenditures · $0 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 4 · Official evidence · p. 7
City of El Paso · PCP09ST0020 · Construction
UMC Bus Bay Extension
$34,351,380 historical expenditures · $397,041 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 2 · p. 7 · p. 21
City of El Paso · PCP10TRAN90 · Design
Montana Pedestrian Enhancement
$381,144 historical expenditures · $1,988,257 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 2 · Official evidence · p. 1 · p. 11 · p. 19
City of El Paso · PCP11MT030 · Design
Montecillo Brio Station
$11,092,575 historical expenditures · $353,308 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 1 · Official evidence · p. 1 · p. 2 · p. 7 · p. 19 · p. 21
City of El Paso · PCP11MT050A · Bidding
Far East Transfer Center
$581,156 historical expenditures · $890,037 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 5 · Official evidence · p. 11 · p. 12
City of El Paso · PCP13LIBA11 · Construction
Memorial Park Branch Library Expansion
$581,039 historical expenditures · $79,288 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 2 · Official evidence · p. 12 · p. 16
City of El Paso · PCP13PRKA05 · Design
Dick Shinaut Concrete Skate Park
$96,643 historical expenditures · $525,108 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 5 · Official evidence · p. 12
City of El Paso · PCP13PRKA06 · Construction
Eastside Regional Park Phase 1
$47,871,494 historical expenditures · $1,440,044 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 5 · Official evidence · p. 10 · p. 12
City of El Paso · PCP13PRKA14 · Design
Modesto Gomez Park
$142,713 historical expenditures · $92,430 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 12 · p. 13
City of El Paso · PCP13PRKA20 · Pre-Design
CandleLighters of El Paso Food Pantry
$498,664 historical expenditures · $321,726 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City districts 1, 2, 3, 4, 7, 8 · Official evidence · p. 13
City of El Paso · PCP13PRKA23A · Bidding
Joey Barraza and Vino Memorial Park Phase 2
$347,241 historical expenditures · $547,664 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 4 · Official evidence · p. 13
City of El Paso · PCP13PRKA24 · Bidding
Sports Field Lighting (Veterans, Nations Tobin, Capistrano)
$3,301,971 historical expenditures · $1,527,228 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City districts 2, 4, 6 · Official evidence · p. 12 · p. 13
City of El Paso · PCP13PRKA27A · Design
Salvador Rivas Park Phase III
$60,563 historical expenditures · $346,208 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 5 · Official evidence · p. 13
City of El Paso · PCP13PRKC06 · Design
Training & Instructional Multipurpose Center Pool
$224,567 historical expenditures · $19,258 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 3 · Official evidence · p. 4 · p. 12 · p. 13
City of El Paso · PCP13PRKD02 · Pre-Design
Grandview Recreation Center
$230,273 historical expenditures · $1,945,833 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 2 · Official evidence · p. 13
City of El Paso · PCP13PRKD03 · Construction
Lomaland Recreation Center
$10,801,383 historical expenditures · $227,389 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 7 · Official evidence · p. 13
City of El Paso · PCP13PRKD04 · Construction
Alameda Recreation Center/Library Combo & Alameda Flat fields
$10,107,413 historical expenditures · $67,816 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 3 · Official evidence · p. 8 · p. 13
City of El Paso · PCP13PRKD05 · Construction
Chamizal Recreation Center
$10,899,259 historical expenditures · $485,355 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 8 · p. 13
City of El Paso · PCP13PRKD06 · Pre-Design
Nolan Richardson Recreation Center
$177,052 historical expenditures · $1,638,985 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 2 · Official evidence · p. 13
City of El Paso · PCP13PRKD07 · Pre-Design
Pat O'Rourke Recreation Center
$31,085 historical expenditures · $0 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 13
City of El Paso · PCP13PRKD08 · Design
Pavo Real Recreation Center Improvements
$199,387 historical expenditures · $1,330,743 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 6 · Official evidence · p. 13
City of El Paso · PCP13PRKD10 · Bidding
Veterans Recreation Center
$178,701 historical expenditures · $1,142,098 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 4 · Official evidence · p. 13
City of El Paso · PCP13PRKE02 · Pre-Design
Palisades Trailhead
$1,007,206 historical expenditures · $50,040 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 1 · Official evidence · p. 13
City of El Paso · PCP13ST003Y1I · Construction
MCA Quiet Zones
$911,016 historical expenditures · $3,444,258 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City districts 3, 8 · Official evidence · p. 8
City of El Paso · PCP13ST006Y7 · Bidding
Gene Torres NTMP
$204,370 historical expenditures · $440,456 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 7 · Official evidence · p. 9
City of El Paso · PCP14IB001 · Bidding
PDN Roundabout
$1,199,134 historical expenditures · $1,786,505 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 9 · p. 10 · p. 11 · p. 19 · p. 21
City of El Paso · PCP16TRAN04 · Design
Central Business District IV
$2,238,052 historical expenditures · $0 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 2 · p. 8
City of El Paso · PCP17MF002 · Construction
Police Department Parking Improvements
$1,881,988 historical expenditures · $457,254 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 2 · Official evidence · p. 10
City of El Paso · PCP17PRK03 · Construction
District 4 Neighborhood Water Park
$12,748,582 historical expenditures · $225,060 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 4 · Official evidence · p. 4 · p. 8 · p. 10 · p. 11 · p. 16
City of El Paso · PCP17ST003 · Construction
James Street (Reconstruction)
$1,502,818 historical expenditures · $98,408 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 7 · Official evidence · p. 9 · p. 22
City of El Paso · PCP17ST011 · Bidding
Viscount Boulevard Roadway Lighting and Median Landscape
$348,739 historical expenditures · $2,739,292 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 3 · Official evidence · p. 9 · p. 11
City of El Paso · PCP17ST015 · Construction
River Bend Phase III
$2,427,733 historical expenditures · $784,385 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 9 · p. 22
City of El Paso · PCP17ST028 · Design
Doniphan and Bird Traffic Signal
$13,785 historical expenditures · $1,389 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 10
City of El Paso · PCP17ST031 · Design
Doniphan and West Green Traffic Signal
$12,836 historical expenditures · $2,672 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 1 · Official evidence · p. 10
City of El Paso · PCP17TRAN4 · Construction
Chamizal Pedestrian Enhancements Phase I
$1,315,060 historical expenditures · $0 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 10 · p. 11 · p. 19
City of El Paso · PCP18PRK02 · Design
Tom Lea Slope Stabilization
$703,526 historical expenditures · $75,445 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 1 · Official evidence · p. 11
City of El Paso · PCP18PRK03 · Design
Eastside Sports Complex Design/Build Phase II
$2,200,127 historical expenditures · $10,279,201 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 5 · Official evidence · p. 11
City of El Paso · PCP18ST006 · Construction
Rich Beem Street Lighting
$1,354,253 historical expenditures · $42,480 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 5 · Official evidence · p. 9
City of El Paso · PCP18ST009 · Construction
Brian Ray Reconstruction
$1,592,313 historical expenditures · $87,122 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 6 · Official evidence · p. 11
City of El Paso · PCP18ST010 · Construction
Hawkins Reconstruction
$6,171,313 historical expenditures · $3,895,852 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 3 · Official evidence · p. 11 · p. 22
City of El Paso · PCP18ST011 · Design
Railroad Reconstruction
$1,016,354 historical expenditures · $389,445 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 4 · Official evidence · p. 11
City of El Paso · PCP18ST012 · Design
Schuster Reconstruction
$776,830 historical expenditures · $4,730,612 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City districts 1, 8 · Official evidence · p. 11 · p. 22
City of El Paso · PCP18ST013 · Bidding
Ted Houghton Reconstruction
$130,295 historical expenditures · $1,036,874 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 6 · Official evidence · p. 9 · p. 11
City of El Paso · PCP18TRAN02 · Bidding
Chamizal Pedestrian Enhancements Phase 2
$209,227 historical expenditures · $40,204 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 8 · Official evidence · p. 11 · p. 19
City of El Paso · PCP18TRAN03 · Design
Davis Bridge Reconstruction
$756,052 historical expenditures · $82,287 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 6 · Official evidence · p. 2 · p. 11 · p. 19 · p. 22
City of El Paso · PCP18TRAN04 · Design
Delta Bridge Reconstruction
$276,420 historical expenditures · $15,243 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 3 · Official evidence · p. 2 · p. 10 · p. 11 · p. 19
City of El Paso · PCP18TRAN05 · Design
Yarbrough Bridge Reconstruction
$281,412 historical expenditures · $18,317 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 7 · Official evidence · p. 11 · p. 19 · p. 22
City of El Paso · PCP18TRAN06 · Design
Alabama Bridge Reconstruction
$206,160 historical expenditures · $877,198 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City district 2 · Official evidence · p. 2 · p. 11 · p. 19 · p. 22
City of El Paso · PCP19ESMP · Design
Eastside Master Plan - Eastside Master Plan
$487,431 historical expenditures · $7,036 obligations · as of 2021-03-31
- Project directoryCurrent GIS project ID and district attribution.
- Accounting actualsHistorical totals through 2021-03-31.
- Agenda decisionNo exact shared agenda-item ID in the project record.
- Executed contractNo exact shared contract ID in the project record.
- Vendor paymentsProject totals are documented; individual checks are not linked.
City districts 5, 6, 7 · Official evidence · p. 11